Project 5: Poland, Olszynski park

  • Country: Poland
  • Airium application: Airium at a density of 250 kg/m3 is used with a thickness of 5 cm in intermediary floor systems over 36 floors.
  • Customer: Akplan
  • Olszynki Park is a landmark project in the heart of Rzeszow. It boasts the 3rd tallest tower in the country (161m), it includes 2 towers of 18 and 36 floors and is a mixed used development including flats, shopping mall, restaurants, SPA etc.
  • Surface: 27,108 m²
  • Why was Airium chosen and what was the impact:
    - Logistical and cost gain: pump Airium from the ground, no need to lift up insulation with a crane
    - Very easy to place, covers ducts and pipes and adapts to all shapes
    - No risk of curling of the screed
    - Thermal and acoustics performance fulfilled at full system level